Versions Compared
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Data Plane
Programming / In-Band Network Telemetry WikiProgramming
The Data Plane Programming (DPP) subtask in the Network Technology Evolution task (Task 1) of the Network Technologies and Services Development work package (WP6) of the GÉANT GN4-3 project is assessing the applicability and usefulness of DPP technologies in two use cases of interest to the GÉANT NREN community: DDoS detection and mitigation and high
- High precision network monitoring using In-Band Network Telemetry (INT).
- DDoS detection and mitigation
In-Band Network Telemetry (INT)
Current Experimentation on INT Implementation in GN4-3The DPP team in GN4-3 WP6 created a distributed testbed for testing an in-house P4 implementation of In-Band Network Telemetry. The tests are designed to provide performance characteristics of the production network and analyse the infrastructure requirements to best gather and visualise the INT data. This testbed doesn’t (and isn’t meant to) mimic exactly how INT technology could be deployed inside GÉANT and NREN production networks, instead, it is targeted at validating INT functionalities and capabilities for advanced monitoring. Practical deployment details will depend on the main goal and the granularity of information requested, as an example a specific flow can be selected or generated and monitored end-to-end. The INT information can be generated only in the two ends, or information can be added up to each intermediate hop, provided it is INT enabled. The node has to provide INT functionality, the most performant are based on specific hardware (tofino, FPGA, e.g.).
Recent summaries:
Whitepapers:
Image Added Image Added
DDoS detection using data plane Programming
The intermediate results of the data plane programming work on DDoS detection and mitigation were presented at the Performance Management Workshop in March 2020 [download].
Contact Us
We are very interested to hear from members of the community working on INT, whether you wish to share your knowledge or find out more about INT yourselves. You can email the GN4-3 WP6 INT team at:
Info | ||||
---|---|---|---|---|
| Deploying In-band Network Telemetry (INT) on R&E Networks, March 2nd, 2021
| |||
Panel | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||
|