Plan

Ongoing
In the pipeline/planned
Done







JulyAugustSeptemberOktoberNovemberDecember

ActivityResponsible Deadline





1

Test environment

Documentation/instructions

Leif28
August
Aug





2Sandbox ACS
Ralf

Ralph @ ACS

?







3Sandbox ProQuest

Scott @ ProQuest

1 September
Sept





4Sandbox MyunidaysAlan @ myunidays
?
1 Sept





5

Sandbox LibLynx

Paul @ LibLynx

1 September
Waiting for Leif





6

UX Prototype


Anna@ProQuest

15 Oct





7

Integration prototype

Connect to test environment

7UX first version design
Leif15 Oct
ProQuest






8ImplementationFeedback loop






9Testing
1 November

Nov





10
PrototypeUX teamsOctober 15
Testing in librariesAlistair Morrison






11
Testing in libraries12Survey
MDUI docHeather Flanagan






Description and status of activities 

  1. Test environment and instructions 
    Status: Done 16 august by Leif Johansson and sent to the responsible for sandboxes. Link to instructions.  
    Instructionshttps://docs.google.com/document/d/1ahzr0Z1wdFw_awVVRKnY9LeeeJyNrY1LRyrQikAoGs8/edit?usp=sharing
    Discovery engine: https://nightly.pyff.io
     
  2. ACS sandbox. Lead: Ralph Youngen, R_Youngen@acs.orgACS Sandbox
    Status: No replyWill be up within a few months.

  3. ProQuest sandbox. Lead: Scott McCarthy, Scott.McCarthy@proquest.com
    Status: Ongoing. Committed to have the sandbox The sandbox is up and running by 1 september 
  4. MyUnidays Sandbox
    Status: No reply 
  5. LibLynx sandbox
    Status: Ongoing. Committed to have the sandbox up and running by 1 september 
  6. Integration
    Status:  
  7. UX first version design
    Status: 
  8. Implementation
    Status: 
  9. Testing
    Status:  
  10. Prototype
    Status
  11. Testing in libraries
    Status: 
  12. Survey
    Status: Ongoing. Heather sent out the following link to get started: https://912922ee.optimalworkshop.com/chalkmark/ra21?tag=Committee
  13. , Leif is working on dev.

  14. MyUnidays sandbox. Lead: Alan Buxey, alan.buxey@myunidays.com
    Status: The sandbox is up and running, Leif is working on dev.

  15. LibLynx sandbox. Paul Dixon, paul@liblynx.com
    Status: Waiting for 7. integration prototype (Leif).

  16. UX Prototype. Lead: Anna.Rouben@proquest.com
    Goal: Have a presentable draft of what the interface would look like (v1) to present and share till October 15.
    Status: Ongoing. Regular biweekly work meetings Thursdays 16-16:30 CEST uneven weeks.
    Heather sent out link to get started with the survey: https://912922ee.optimalworkshop.com/chalkmark/ra21?tag=Committee
    Mockups at https://drive.google.com/drive/folders/0B7TGCtw_RB2zSHVjSjNQbXdIVUE?usp=sharing
    UX track tasks: https://docs.google.com/document/d/1OkHZ9HGl8IsjhLwVFMHm9KA9KhdrtyFo9mgJmkYxDzE/edit

    About the 3 different options (A, B and C) on https://docs.google.com/drawings/d/1LmzD6QwmZQdIdFz1wPIMtci-32tm7q4PTyJi9Ll9zT0/edit
    The choice of option affects user flow - try to make a model for all three different options.

    RA21 - San Francisco UX Workshop Notes (From Serena Rosenhan)
    In the session we did 4 activities – you’ll see photos of the output of those in the summary deck.   

    1. One question you would like to get answered today
    2. Personas  (we built 4, invited people to add important ones that were missed)
    3. 3 user workflows
    4. Action items 

    Meeting notes from last week’s UX Track call where the UX-group went over highlights and tried to progress some of the action items.  

  17. Integration prototype. Lead: leifj@sunet.se.
    Goal: First draft to be up by end of November (after IETF).
    Status: Ongoing and catching up with the discussions during the workshop in San Fransisco. 

  18. Implementation
    Status: 

  19. Testing. Have the first successful tests till November.
    Status:

  20. Testing in libraries. Lead: Alistair Morrison
    Status: 
     
  21. Document that describes the use of MDUI
    Status: ongoing, will be send to REFEDS for review 

To do's

  • Follow up performance needs about discovery (?)
  • Follow up on the proxy-item Jon-Chris (Heather)

Meetings

Face to face:

  • London - July 7
  • Utrecht - September 1 at SURF
  • San Francisco - October 18, 13:30-16:30
    Hyatt Regency San Francisco
    5 Embarcadero Center 
  • London - December 8
    Part of the STM week

Online:

Biweekly online status meetings: Thursdays even weeks (starting 7 sept) 16:00-16:30 CEST at https://hangouts.google.com/hangouts/_/sunet.se/ra21

Biweekly online UI meetings: Thursdays uneven weeks 16:00-16:30 at https://proquestmeetings.webex.com/join/srosenhan